Pre-Installation – LAS-F
Pre-Installation
FOLLOWING STEP BY STEP FOR SPECIFIC PRACTICE. YOU WILL KNOW THE DETAIL OPTIONS THROUGH THE PRACTICES.
01 OVERVIEW >02 KEY USP > 03 PREINSTALLATION > 04 CABINET INSTALLATION > 05 CABLING > 06 LDM ATTACHMENT > 07 SYSTEM CONTROLLER > 08 EVALUATION > 09 CERTIFIED PARTNER
Inspection
1. Packing List
Check the supplied items against the packing list.
![](http://news.europedsl.com/wp-content/uploads/2021/02/packinglist-1024x407.png)
2. Cabinet test.
Visually inspect the cabinet for shipping damage.
Power up cabinets and operate the self test function, check for pixel defects on white, red, green, blue patterns
![](http://news.europedsl.com/wp-content/uploads/2021/01/image-77.png)
![](http://news.europedsl.com/wp-content/uploads/2021/02/Screenshot-2021-02-09-at-18.27.21-1024x856.png)
![](http://news.europedsl.com/wp-content/uploads/2021/02/Screenshot-2021-02-09-at-18.27.42-1024x773.png)
Mask Lifting
Remove the protective mask covering the LDM
![](http://news.europedsl.com/wp-content/uploads/2021/02/masklift.png)