Pre-Installation – LAS-F

Pre-Installation

FOLLOWING STEP BY STEP FOR SPECIFIC PRACTICE. YOU WILL KNOW THE DETAIL OPTIONS THROUGH THE PRACTICES.
01 OVERVIEW >02 KEY USP > 03 PREINSTALLATION > 04 CABINET INSTALLATION > 05 CABLING > 06 LDM ATTACHMENT > 07 SYSTEM CONTROLLER > 08 EVALUATION > 09 CERTIFIED PARTNER


Inspection

1. Packing List

Check the supplied items against the packing list.

2. Cabinet test.

Visually inspect the cabinet for shipping damage.
Power up cabinets and operate the self test function, check for pixel defects on white, red, green, blue patterns


Mask Lifting

Remove the protective mask covering the LDM



Let's move to Cabinet Installation

Cabinet Installation