Pre-Installation – GSCD

Pre-Installation

FOLLOWING STEP BY STEP FOR SPECIFIC PRACTICE. YOU WILL KNOW THE DETAIL OPTIONS THROUGH THE PRACTICES.
01 OVERVIEW >02 KEY USP > 03 PREINSTALLATION > 04 CABINET INSTALLATION > 05 CABLING > 06 SYSTEM CONTROLLER > 07 EVALUATION > 08 CERTIFIED PARTNER


Inspection

1. Packing List

Check the supplied items against the packing list.

2. Cabinet test.

Visually inspect the cabinet for shipping damage.
Power up cabinets and operate the self test function, check for pixel defects on white, red, green, blue patterns

Press “ Test pattern button” for White/Red/Green/Blue internal pattern
Check dot defect, the appearance of the cabinet and connectors

GSCD Training Kit – LG Sample

The sample mounting kit are aligned using horizontal and vertical mounting bars. Fit the cabinets to mounting bars and position the structure on the kit with the right srews.


Let's move to Cabinet Installation

Cabinet Installation