Pre-Installation – GSCD
Pre-Installation
FOLLOWING STEP BY STEP FOR SPECIFIC PRACTICE. YOU WILL KNOW THE DETAIL OPTIONS THROUGH THE PRACTICES.
01 OVERVIEW >02 KEY USP > 03 PREINSTALLATION > 04 CABINET INSTALLATION > 05 CABLING > 06 SYSTEM CONTROLLER > 07 EVALUATION > 08 CERTIFIED PARTNER
Inspection
1. Packing List
Check the supplied items against the packing list.
![](http://news.europedsl.com/wp-content/uploads/2021/06/GSCD13.png)
2. Cabinet test.
Visually inspect the cabinet for shipping damage.
Power up cabinets and operate the self test function, check for pixel defects on white, red, green, blue patterns
![](http://news.europedsl.com/wp-content/uploads/2021/06/GSCD12-1024x497.png)
![](http://news.europedsl.com/wp-content/uploads/2021/01/image-77.png)
![](http://news.europedsl.com/wp-content/uploads/2021/01/packaging2-1024x455.png)
GSCD Training Kit – LG Sample
The sample mounting kit are aligned using horizontal and vertical mounting bars. Fit the cabinets to mounting bars and position the structure on the kit with the right srews.