Configuration – Magnit

Configuration

FOLLOWING STEP BY STEP FOR SPECIFIC PRACTICE. YOU WILL KNOW THE DETAIL OPTIONS THROUGH THE PRACTICES.
01 KEY USP > 02 COMPONENT > 03 CONFIGURATION > 04 INSTALLATION > 05 SOFTWARE CONFIGURATION > 06 EVALUATION > 07 CERTIFIED PARTNER


Standard UHD Configuration

There are 6 Main Unit cabinets at the bottom and 30 Secondary Unit Cabinets on the top. Signal and power cables are connected to the main at the bottom as shown in the figure, and signal and power are transmitted to the secondary unit cabinet through the main unit cabinet.

Redundancy UHD configuration

When redundancy is added to the configuration, the additional elements need to be added as depicted above.


Let's move to Installation

Installation