Installation – Magnit

Installation

FOLLOWING STEP BY STEP FOR SPECIFIC PRACTICE. YOU WILL KNOW THE DETAIL OPTIONS THROUGH THE PRACTICES.
01 KEY USP > 02 COMPONENT > 03 CONFIGURATION > 04 INSTALLATION > 05 SOFTWARE CONFIGURATION > 06 EVALUATION > 07 CERTIFIED PARTNER


Installation on profile stand with wall mounts

The following installation is intended for a Full HD (3×3) arrangement:

1.1 Check packaging content

Before beginning the installation, please make sure the following packaging content is delivered:

-Profile stand with wall mount
-Main cabinet units 3EA
-Secondary  cabinet units 6EA
-LED Controller 1EA

1.2 Preparing the tools

Before beginning the installation, please make sure the following material is prepared:

2.1 General overview

In this section, a general overview of the process will be provided, every step will be detailed further in this guide.

2.2 Part details

Detailed information on unpacking the cabinets from their boxes

2.3 How to handle the cabinets

In order to avoid any damages to the cabinets, we recommend the following workflow


2.4 Installing the main cabinets on the wall mount stand

3.1 Power connection

3.2 Power cable assembly

4.1 Secondary cabinets details

4.2 Installing the secondary cabinets


5.1 Cabinet disassembly details

5.2 Removing the flushes between cabinets

6.1 Fine tuning bolts details

After removing the flushes between cabinets, fine tuning using the tan bolts is required to remove the gaps.

6.2 Removing the gaps


Let's move to Software Configuration

Software Configuration